Integrated Gas Scrubbing and Capture System

United Kingdom

Integrated Gas Scrubbing and Capture System

Project

Design, fabrication and installation of a new modularized SO2 / CO2 scrubbing and capture system at a power plant

 

 

GCM Mandate

Preliminary and Detailed Engineering




GCM provided the following services:

 

  • Multidisciplinary Engineering c/w work specifications
  • Mechanical/Structural layouts and equipment arrangements in 3D
  • Module design optimization
  • Procurement services
  • Supervision of modules fabrication in China
  • Technical support to end user site installation
BNQ Certified System

Activity sectorsz

Oil and Gas Chemical and Petrochemical Mining and metals Energy Manufacturing Pharma, Biotech and Food Environment and Sustainable Development

You want to be a part of our team?

We are always looking for new talent!


See the available offers


OR

Send a
personalized application