Detailed Engineering, Procurement, Project Management, Construction Management Assistance





GCM led all engineering activities for the new production line including:

  • Equipment mechanical layout arrangement and optimisation including polymer transportation system (new pneumatic conveyors), polymer feeding system, extruders, new film stretching and treatment systems, 250 ft long oven, cooling and heating heat exchangers and packaging line.
  • New and old equipment integration from a USA plant
  • Cooling and heating systems process design
  • New PLC (Siemens) and DCS (Foxboro) control systems engineering and programming
  • Installation of new overhead cranes and monorails
  • All electrical systems (Drive systems, MCC’s, substations)
  • Procurement and cost control activities for the whole project
  • Preparation of pre-commissioning and start-up procedures
  • Work done in collaboration with plant personnel and USA technical department
  • Successful start-up
BNQ Certified System

Activity sectorsz

Oil and Gas Chemical and Petrochemical Mining and metals Renewable Energy Manufacturing Pharma, Biotech and Food Environment and Sustainable Development

You want to be a part of our team?

We are always looking for new talent!


See the available offers


OR

Send a
personalized application