- ServicesIntegrated Technical ServicesEngineering and project execution
- Industries
- Achievements
- About Us
- Careers
- Useful Infos
- Contact
Achievements
Loading Arm Modifications
Québec, Canada
Project description
The project consists in modifying a top loading arm to make bottom loading possible according to API RP 1004
Total project cost
$2M
GCM Mandate
Detailed engineering
Deliverables
- Automation and modifications to the AccuLoad
- Specification for integrated overflow supervision and grounding system
- Vapor recovery to API RP505 and applicable codes such as CCME and petroleum regulations
- Preparation and issuance of tenders for mechanical works| Technical specification of the loading arm
- Modifications and automation of the Accuload
- Specification for the overflow supervision and ground fault.
- Meet API RP505 concerning vapour recuperation as per the petroleum product rules and regulations.
- Prepare and issue tenders for mechanical works.