Loading dock for sulfuric acid trucks
Québec, Canada
Project description
Installation of a loading dock for trucks transporting sulfuric acid.
Total project cost
$4M
GCM Mandate
Multidisciplinary detailed engineering
Deliverables
- Complete DBM activities
- Complete preliminary engineering, detailed engineering and commissioning support
- Provide engineers to the owner
- Perform pre-operational checks
- Meet schedule with early start of detailed engineering activities