Home > Industry sectors > Oil and Gas

Oil and Gas

Here are a few examples of projects completed by GCM in the Oil and Gas sector.

Preheater
Preheater

Project 

Installation of an air preheater on the crude unit's kiln

($11 M)

 

 

GCM's mandate

Preliminary and detailed engineering

Read about this project
Jet Fuel Tanks
Jet Fuel Tanks

Project

New Jet Fuel Tanks

 

GCM's Mandate

Detailed Engineering

Read about this project
Loading Arms
Loading Arms

 Project

Loading Arms

 

GCM's Mandate

Detailed Engineering

Read about this project
Pump House Reshaping
Pump House Reshaping

Project

Pump House Reshaping

 

GCM's Mandate

Preliminary Engineering ± 30 %
Detailed Engineering

Read about this project
Rail Car Loading Rack
Rail Car Loading Rack

Project

Rail Car Loading Rack 

 

 

 

GCM's Mandate 

Engineering, Procurement and Construction Management

Read about this project
Sulphuric Acid Tanks
Sulphuric Acid Tanks

 

Project

Major repairs and modifications in the sulphuric acid tank area

 

GCM's Mandate

Preliminary and Detailed Engineering

Read about this project
Catalytic Cracker Flue Gas Waste Heat Boiler Replacemen (...)
Catalytic Cracker Flue Gas Waste Heat Boiler Replacement

Project

Catalytic Cracker Flue Gas Waste Heat Boiler Replacement 

 

 

 

GCM's Mandate

FEED

Preliminary and Detailed Engineering

Read about this project
Furnace Burner Management System Upgrade
Furnace Burner Management System Upgrade

 

Project

Furnace Burner Management System (BMS) Upgrade

 

 

GCM's Mandate

Engineering, Procurement and Construction Management

Read about this project
Biomass Centrifuge
Biomass Centrifuge

 

 

 

 

 

 

Project 

Biomass Centrifuge Upgrade. The main objective was to investigate current operation conditions to identify the main causes of the unreliability of this operation. In addition, the centrifuge’s location needed to be reviewed.

GCM's Mandate

Conceptual study

Read about this project
SAGD Central Processing Facility
SAGD Central Processing Facility

 

 

 

 

 

Project 

Following the conversion of a Once Through Steam Generator from a sweet to a mixed sour gas service, the exhaust stack sustained severe corrosion and failed three times since its installation. The project aimed to rectify this situation.

 

GCM's Mandate 


Redesign the stack to eliminate the root causes of failure and allow continued long-term service.

Read about this project
Pre-heat trains improvement
Pre-heat trains improvement

Project  

Factory production capacity increase by improving the pre-heat trains and installing new pumps, vessels, racks and electrical power supplies.  

 

 

  

GCM's Mandate 

Engineering and construction management support

Read about this project
Unloading of petroleum products
Unloading of petroleum products

 

 

 

 

Project  

Allow the unloading of petroleum products (jet fuel, diesel, furnace oil) from pier to distribution center

 

GCM's Mandate 

Multidisciplinary detailed engineering

Read about this project
Construction of new solvents tanks
Construction of new solvents tanks

Project 

Construction of two new solvent tanks at an asphalt refinery. Pumping and distribution system for shipment by truck or rail.

 

GCM's Mandate 

Multidisciplinary engineering

Read about this project
Electrical room enlargement
Electrical room enlargement

 

 

 

 

 

 

Project  

Enlargement of an existing electrical room for the replacement of a 4.16 kV switchgear by two 4.16 kV switchgears to permit greater flexibility and reliability. This project included coordination with an architect, the engineering for the electrical feed of the new switchgears, the electrical distribution of the building expansion, the new cable trays, the transfer of the existing loads to the new switchgears, the electrical studies.

 

GCM's Mandate 

Multidisciplinary engineering

Read about this project
Burner Management System
Burner Management System

 

 

 

 

 

Project  

Burner Management System Upgrade 

 

GCM's Mandate 

Engineering and Construction Management

Read about this project
Construction of a new Control room
Construction of a new Control room

Project  

Construction of a new blast-resistant Control Room

 

 

GCM's Mandate 

Detailed Engineering
Procurement
Project Management
Construction Supervision

Read about this project
Deluge system
Deluge system

Project  

Installation of a new deluge system to protect eight polymerisation reactors. The project also required the capacity to cover a total of 5 deluge zones.

 

GCM's Mandate 

Multidisciplinary detail engineering works for the design of the foundation, the prefab building, the fire water header (5 zones), the piping, spray nozzle pattern and system automation.

Read about this project
Heavy Oil Battery
Heavy Oil Battery

Project 

Expansion of a heavy oil battery whereby emulsion treating and water disposal capacity were increased by over 200%.  

 

 

GCM's Mandate 

Preliminary Engineering and Cost Estimate (+/- 25%)

Read about this project