Locker room ventilation

Québec, Canada

Project description

Carry out the plans and specifications for the modifications to be made to resolve the problem related to the filing of a complaint with the CNESST concerning ventilation.

Total project cost

$1M

GCM Mandate

Preliminary study and design

Deliverables

  • Survey of existing facilities
  • Determine the best solution to the problems
  • Estimate construction costs
  • Prepare plans and technical specifications for construction