Skip to content
Achievements

Benzene Vapor Recovery

Québec, Canada

Project description

Recovery of benzene vapors during ship loading.

Total project cost

$6M

GCM Mandate

Multidisciplinary detailed engineering

Deliverables

  • Project cost estimates ± 15
  • Detailed engineering for all disciplines
  • Development of the schedule for all stages of the project
  • Technical data sheets for the purchase of equipment
  • Schedule and cost control