Skip to content
Achievements

PSI Coking Unit

Saskatchewan, Canada

Project description

While respecting the customer’s rules and safety programs, GCM reviewed the impact of the operational conditions already in place on the coker’s piping and equipment.

Total project cost

$12M

GCM Mandate

Multidisicplinary engineering and construction assistance

Deliverables

  • Review of operating conditions
  • Simulations
  • Examination of piping, equipment and pumps
  • Examination of the integrity of the structure
  • Stress analysis
  • Review of evaluation lists
  • Technical recommendations
  • Construction package
  • On-site assistance

Similar projects