Chemical plant
Québec, Canada
Project description
Evaluation of the condition of a pressure vessel that caught fire during a plant shutdown according to the principles of “Fitness for Service” (API 579-1/ ASME FFS-1).
Total project cost
S/O
GCM Mandate
Mechanical integrity assessment and repair strategy
Deliverables
- Inspection plan for level 3 FFS analysis
- Repair plan and procedures
- Inventory of deflections and deformations
- Hardness measurements, radiography, dye penetration on damaged areas
- Destructive testing of selected areas to determine mechanical properties
- Coordination with local authorities
- Damage assessment and finite element analysis according to API 579 part 11