CO2 compressor

Saskatchewan, Canada

Project description

Installation of a new 10,000 hp multi-stage CO2 compressor, a CO2 dehydration unit and an electrical substation supplying the CO2 capture and transport section to a diesel well.

Total project cost

$125M

GCM Mandate

Preliminary multidisciplinary engineering work to design the compressor and electrical substation.

Deliverables

  • Preliminary multidisciplinary engineering
  • Project cost estimate (±30%)
  • Detailed schedule
  • 3D modeling
  • Location of major equipment, including the compressor
  • EPC proposal for the realization of the project
  • Complete design of the building, infrastructure and substation
  • Detailed construction planning