Drainage from pier to port

Québec, Canada

Project description

Construction of new maintenance facilities for the equipment used for the transshipment of goods at the dock.

Total project cost

$1M

GCM Mandate

Development of modifications to the unloading dock drainage system and selection of a sediment collection system to separate particulate matter from runoff in accordance with current regulations.

Deliverables

  • Project cost estimate (+/-30%)
  • Review of existing infrastructure
  • Modification to the runoff collection network
  • Selection of the optimal separator
  • Preparation of the technical report
  • Preparation of the environmental impact assessment report for the new maintenance facilities.