Achievements
Drainage from pier to port
Québec, Canada
Project description
Construction of new maintenance facilities for the equipment used for the transshipment of goods at the dock.
Total project cost
$1M
GCM Mandate
Development of modifications to the unloading dock drainage system and selection of a sediment collection system to separate particulate matter from runoff in accordance with current regulations.
Deliverables
- Project cost estimate (+/-30%)
- Review of existing infrastructure
- Modification to the runoff collection network
- Selection of the optimal separator
- Preparation of the technical report
- Preparation of the environmental impact assessment report for the new maintenance facilities.