Project description

The project consisted in the design, fabrication and start-up of equipment dedicated to the purification of the amine (APU) in the CO2/SO2 extraction process.

Total project cost

$1.5MM

GCM Mandate

Detailed multidisciplinary engineering, supervision of shop floor manufacturing and supervision of equipment start-up on site.

Deliverables

  • Quality control according to the strictest requirements with the manufacturer.
  • Design according to performance and operability criteria of a new world technology.
  • Certification of all pressure piping according to TSASK requirements.
  • Technical support during the installation of the equipment on site with IAC.
  • Management and resolution of deficiencies during site start-up.