Skip to content
Achievements

Regasification terminal at the sawmill

Québec, Canada

Project description

The project consists of building a new liquefied natural gas storage and evaporation unit on the sawmill site to meet the energy needs of the dryers.

Total project cost

$4M

GCM Mandate

Detailed engineering for the installation and integration of equipment and modules for a new liquefied natural gas storage and evaporation unit

Deliverables

  • Foundation drawings
  • Installation specifications covering civil works
  • Mechanical specifications
  • Pipe list
  • Supervision of the design of general arrangement drawings
  • Supervision of design of field welded interconnecting pipelines including supports
  • Layout drawings
  • Supervision of electrical distribution design drawings (one-line diagram)
  • Supervision of the realization of the grounding drawings
  • Electrical installation specifications
  • Report – Safety review (HAZOP)
  • Project note for the dispersion study
  • Project note for the radiation study