- ServicesIntegrated Technical ServicesEngineering and project execution
- Industries
- Achievements
- About Us
- Careers
- Useful Infos
- Contact
Achievements
Regasification terminal at the sawmill
Québec, Canada
Project description
The project consists of building a new liquefied natural gas storage and evaporation unit on the sawmill site to meet the energy needs of the dryers.
Total project cost
$4M
GCM Mandate
Detailed engineering for the installation and integration of equipment and modules for a new liquefied natural gas storage and evaporation unit
Deliverables
- Foundation drawings
- Installation specifications covering civil works
- Mechanical specifications
- Pipe list
- Supervision of the design of general arrangement drawings
- Supervision of design of field welded interconnecting pipelines including supports
- Layout drawings
- Supervision of electrical distribution design drawings (one-line diagram)
- Supervision of the realization of the grounding drawings
- Electrical installation specifications
- Report – Safety review (HAZOP)
- Project note for the dispersion study
- Project note for the radiation study