Skip to content
Achievements

Engine test plant

Québec, Canada

Project description

Add an instrumented safety system to protect aircraft engine test units.

Total project cost

$5M

GCM Mandate

GCM’s mandate was to assess the risk, determine the level of protection required and design the SIS

Deliverables

  • Process hazard analysis
  • Determination of the SIL (Layer of Protection Analysis)
  • Specification of safety requirements
  • Test and validation procedure

Similar projects