Québec, Canada

Project description

The project consists of modifying the existing facility by installing two new lines from the existing tanks.
The modification work includes installation of four new loading arms, installation of a new vapor recovery line between the loading arms and the existing vapor destruction unit (VDU), installation of two new pumps, relocation of the fire water line to accommodate the pumps, and construction of a new electrical room to accommodate the new loads. A new generator and transformer are also required.
The work also includes the installation of a foam water sprinkler system for the four loading arm areas.

Total project cost

$10M

GCM Mandate

Perform detailed engineering and provide all deliverables required for the construction of the new facility.

Deliverables

  • Project cost estimates
  • Diagrams, drawings, one-line diagrams, Arc Flash study, data sheets, specifications for detailed engineering