Project description

Installation of a new purified water production system

Total project cost

$24M

GCM Mandate

Turnkey project where GCM does the engineering, procurement and construction supervision for the design and installation of a purified water production system.

Deliverables

  • Integrated Engineering-Procurement-Construction Project
  • Equipment procurement
  • Cost control
  • Project scheduling
  • Construction supervision
  • Drafting of a validation protocol for the system
  • Execution of the system validation
  • Circuit Breaker Specification
  • Specification of starters
  • Wiring specification
  • Specifications and electrical diagrams for the new panel
  • PLC and HMI programming
  • Start up