Skip to content
Achievements

Fuel offloading area

Québec, Canada

Project description

Improvements to runoff treatment and increase solid fuel storage capacity (coke and coal) to 50,000 t. Modification of the fuel storage area to collect runoff and treat it by settling before discharge.

Total project cost

$4M

GCM Mandate

Detailed multidisciplinary engineering

Deliverables

  • Project cost estimate (+/30%)
  • Preparation of the schedule
  • Sizing of the storage area and volume
  • Sizing of the sedimentation basin
  • Preparation of the technical specifications and the necessary documents for environmental authorizations

Related services

Similar projects