Crude Optimization

Québec, Canada

Project description

This project was to take advantage of the margins of heavy crudes produced in Western Canada to develop an asphalt product in Central Canada.

Total project cost

$110M

GCM Mandate

GCM was responsible for the execution of the multidisciplinary engineering work to complete the DBM and the FEED. In the crude unit, GCM was responsible for the process safety analysis, the corrosion loop specifications and all the corrosion control documentation.

Deliverables

  • DBM and FEED reports with detailed cost estimates