Skip to content
Achievements

Refinery Capacity Expansion

Saskatchewan, Canada

Project description

Increased the plant’s production capacity by improving the crude oil preheating trains coupled with the installation of new pumps, vessels, racks and power supply.

Total project cost

$21M

GCM Mandate

Engineering to improve the performance of the crude oil preheat train and the capacity of the finned overhead condenser.
Design work for heat exchangers, new and existing pumps, and replacement of the existing rge drum; the project included changes in piping, structural piping supports, electrical equipment, and instrumentation that accommodate project modifications while allowing room
Comprehensive PSM services to ensure operational safety

Deliverables

  • Detailed project cost estimates
  • Engineering in all disciplines
  • Planning, monitoring and control of project costs and schedule
  • Procurement services
  • Technical assistance to construction management

PROJECT TEAM

Related services

Similar projects