Replacement of corroded components

Québec, Canada

Project description

The project consists of replacing furnace components, trays, and piping that do not have sufficient life to achieve the expected rotation. A detailed analysis of the effects of corrosion with monitoring solutions are required to avoid future incidents.

Total project cost

$35M

GCM Mandate

GCM provided the engineering for the DBM, FEED and detailed engineering as well as a cost estimate.
GCM’s metallurgical expertise was necessary to evaluate the current situation and provide the best solutions adapted to the service.

Deliverables

  • All necessary engineering (preliminary and detailed) to achieve the project objectives
  • Construction support