Skip to content
Achievements

Upgrading of ventilation systems

Québec, Canada

Project description

Upgrade of ventilation systems in a natural gas delivery station.
Replacement of controls and ductwork, including: ventilation, electric unit heater, glycol unit heater, generator control damper, ventilation shutdown with fire alarm, exhaust ventilation start-up on gas detection, and ventilation start-up for boiler air supply
Evaluation of the REZNOR ventilation unit for recovery or replacement
Evaluation of motorized damper actuators for recovery or replacement
New explosion proof exhaust fan for the control room
Validation of the ventilation ductwork
Technical assistance for bids and on site

Total project cost

$4M

GCM Mandate

Detailed engineering for 2D drawings and specifications for mechanical, controls and electrical tenders and summary equipment evaluations. Partial supervision of the work and assistance to the client is required.

Deliverables

  • Mechanical and electrical plans and specifications
  • Construction support

Similar projects