Replacement of the pumping tank at the drying plant
Québec, Canada
Project description
Installation of a new sulfuric acid pumping tank (93% H2SO4).
Total project cost
$0.5M
GCM Mandate
Preliminary and detailed multidisciplinary engineering for the supply and installation of a new concentrated sulfuric acid pumping tank and piping at the acid plant. The tank is made of steel and covered with acid proof brick
Deliverables
- Project cost estimates
- Review and update of P&IDs Installation drawings and specifications (mechanical, piping, civil, electrical and instrumentation)