Project description

New burner management system (Triconex).

Total project cost

$6M

GCM Mandate

Detailed engineering

Deliverables

The project included bringing a purchased stand-alone boiler gas system, instrumentation, and safety and combustion controls up to current industry standards. The boiler’s combustion load control was integrated with the refinery’s main global controller to maintain a constant pressure in the main high pressure steam collection system. Boiler instrumentation was updated to increase reliability and safety integrity in accordance with CSA 149.3 and Alberta Boiler Safety Association active boiler standards. A new burner management logic system was developed for a Triconex triple feed system.