Plastics Manufacturing Plant

Québec, Canada

Project description

Installation of a new fiberglass cooling tower (capacity of 120 MMBTU/h, 18,000 gpm).

Total project cost

$4M

GCM Mandate

Preliminary and detailed engineering

Deliverables

  • Preliminary and detailed engineering
  • Requirements definition and concept development
  • Cost estimates
  • Preparation of installation specifications
  • Assistance in site supervision