Skip to content
Achievements

Replacement of a boiler at the catalytic cracker

Saskatchewan, Canada

Project description

Replacement of a boiler at the catalytic cracker

Total project cost

14 M $

GCM Mandate

Preliminary and detailed engineering

Deliverables

  • Process simulations on HYSYS
  • Specifications for the fabrication of the new equipment
  • Hydraulic calculations
  • Optimization of the water heater efficiency
  • HAZOP safety reviews
  • Drawings and equipment lists in all disciplines
  • Detailed cost estimates

Similar projects