12″ pipe heating

Québec, Canada

Project description

The project consisted of installing a heat exchanger to heat, using steam, the crude oil delivered by train to the refinery prior to storage in the tanks.

Total project cost

$2M

GCM Mandate

Detailed multidisciplinary engineering

Deliverables

  • Compressed timeline
  • Detailed multidisciplinary engineering
  • Project cost control estimate (+/10%)
  • Detailed schedule and cost control
  • 3D modeling
  • Complete purchase estimates
  • Complete construction estimates
  • Pipe stress analyses