New 25 kV line
Québec, Canada
Project description
Design of a new 25kV line, replacement of meters to meet standards, coordination with Hydro-Quebec and technical assistance during construction.
The specifications were designed to ensure that the work required for the power transfer on the new 25 kV line would be completed in a planned sequence to minimize the outage and the work to be done during the planned outage.
Total project cost
$1M
GCM Mandate
Detailed engineering (drawings and specifications) for a new 25 kV line, coordination with Hydro-Québec and support during construction.
Deliverables
- Detailed engineering plans and specifications (electrical)
- Coordination with Hydro-Québec
- Technical assistance during construction