Polyethylene transformation plant

Québec, Canada

Project description

Installation of three new production lines (2002, 2009 and 2020).

Total project cost

$100M for the 3 new lines

GCM Mandate

Multidisciplinary detailed engineering

Deliverables

  • Complete civil-structural engineering of the building and interior and exterior fittings
  • Civil-structural engineering to support the equipment
  • Specification and layout of all mechanical equipment and piping (feeding systems, extrusion/molding, exchangers, automated conveyors, handling and packaging systems, dust collectors, ventilation, etc.)
  • Design of a new plant heat recovery system
  • All electrical systems (substations, CCM, VFD drives)
  • Project management, cost tracking and procurement
  • GCM worked closely with the client and the technology specialists