Steel Plant Shipping Crane Replacement
Québec, Canada
Project description
Replacement of the overhead crane at the steel mill’s dispatch.
Total project cost
$10M
GCM Mandate
Feasibility study with cost estimate (+/30%)
Deliverables
- Complete DBM activities
- Complete preliminary engineering
- Provide engineers to the owner
- Perform pre-operational checks
- Meet schedule with early start of detail engineering activities
- Assess mechanical integrity of equipment and building structure
- Review of billet loading and handling methods to increase efficiency
- Reinforcement of the existing structure and extension of the building.
- Selection of more efficient and automated equipment