Skip to content
Achievements

Cutter Stock Tank Installation

Saskatchewan, Canada

Project description

Construction of two new tanks of diluent products for an asphalt refinery. Pumping and distribution system for shipment by truck or rail.

Total project cost

$2M

GCM Mandate

Multidisicplinary detailed engineering

Deliverables

  • Preliminary design study
  • Cost estimate (+/10%)
  • Process safety review
  • Design of the retention dikes
  • Tank foundation design (granular and concrete)
  • Details for 45 piping connection points
  • Sizing of pumps and piping systems
  • Piping support structures

Similar projects